Storage mezzanine for an industrial building
Utilising the height of a hall to create an additional floor is an effective way to increase storage or production capacity without the need for new building construction. A mezzanine is not just about adding a floor; it is a comprehensive engineered structure that must safely bear prescribed loads and integrate into the existing space. In this article, we summarise the key aspects that determine whether a mezzanine is technically and economically feasible for your property.
When a mezzanine is cost-effective
The economic viability of an intermediate floor depends on the ratio between the costs of supplying and erecting the structure and the price per m² of newly gained area. An intermediate floor is typically worthwhile if:
- Do you have sufficient hall height (usually over 6-7 m so that after installing the structure and flooring, the usable height remains adequate)?
- The existing concrete floor has sufficient load-bearing capacity to transfer reactions from the intermediate floor columns.
- Do you need to separate storage from production or administration from the warehouse?
- The price per m² of a new building is significantly higher than the price per m² of an intermediate floor.
What influences the structural design
The design of an intermediate floor is always bespoke. The main inputs for the calculation are:
- Floor load capacity of the building: Mezzanine columns must be anchored into the existing concrete. If the floor lacks sufficient load-bearing capacity, we will design load-distributing bases or anchoring into new foundation pads.
- Building height: It determines the usable clear height below and above the intermediate floor and the column layout; a denser column grid means a lighter and cheaper structure, but more obstructions in operation.
- Load: We need to know the expected area load (e.g., 5 kN/m² for light storage, 10 kN/m² and more for heavy). The load affects deflection, strength and beam sizing.
- Availability and logistics: The dimensions of the components must correspond to the possibilities for entering the hall and handling inside.
Building permit vs. Notification
Adding an intermediate floor is a building modification, and the specific procedure (notification versus permit) depends on the scope of intervention, change of use, and fire safety solution. Generally, a freestanding structure without interference with the load-bearing skeleton of the hall and without a change of intended use involves simpler administration. We recommend consulting your intention with a designer before ordering the structure. We will provide him with the static calculation and structural documentation as supporting material.
Process from survey to installation
- Site survey: Our technician will perform a laser survey of the hall, check the floor and identify any possible clashes with installations.
- Design and calculation: We prepare static calculations and working documentation. Structures are manufactured in accordance with standards. EN 1090-2 (EXC2).
- Manufacturing: We manufacture steel components in our workshop. The surface treatment is usually hot-dip galvanisation according to EN ISO 1461 for corrosion protection.
- Installation: Installation is carried out while the hall remains operational. We work in coordination with your operations to minimise downtime. Installation typically takes several days to weeks, depending on the scope.
- Delivery: Upon completion, we hand over the finished structure with test protocols and documentation for notification.
Production and installation dates will be specified in the individual offer following the site survey.